Skip to main content

Section L and M Explained, With a Compliance Matrix

By GoNoGo editorial teamLast checked October 13, 20267 min read23 primary sources

Short answer

Read the submission instructions and evaluation criteria before committing your team to a federal proposal. In a solicitation using the uniform contract format, Section L tells you what to submit and how. Section M explains how the agency will evaluate it.

Key facts

No Section L or M?
Whatever the headings, find the instructions and the evaluation criteria and treat them as your L and M.
Must you submit a compliance matrix?
The FAR does not impose a universal requirement to submit one, but an individual solicitation may require it.
No past performance?
A lack of relevant past performance cannot, by itself, receive an unfavorable rating under FAR Part 15.
Does a question to the agency extend the protest deadline?
No. A question to the agency does not extend that deadline.

Read Section M before deciding to bid

Section L tells you what to submit and how. Section M explains how the agency will evaluate it.

  • The basis for award
  • The relative importance of price
  • Each factor and subfactor
  • Past performance and experience
  • Pass/fail requirements

Update the matrix after every amendment.

That review should tell you whether you can meet the requirements, present credible evidence and compete under the stated award method.

Where L and M sit in a solicitation

The uniform contract format runs from Section A through Section M. FAR 15.204-1 describes it. When the solicitation uses this format, your compliance matrix will usually draw from these sections:

Section Check it for
B, Supplies or services and prices/costs The line items your price must cover
C, Description/specifications/statement of work The work your approach must answer
H, Special contract requirements Terms beyond the standard clauses, such as key personnel
J, List of attachments Pricing templates, work statements and forms
K, Representations and certifications What you certify about your firm
L, Instructions to offerors Format, volumes, page limits, how and when to submit
M, Evaluation factors for award Factors, subfactors and how much each counts

Section L may ask for a specific format or separate volumes, such as administrative, management, technical, past performance and pricing. Section M must name every significant factor and subfactor and their relative importance (FAR 15.204-5).

What if the solicitation has no Section L or M

Not every solicitation uses the format. The FAR exempts construction and architect-engineer contracts, among others (FAR 15.204). That matters if you're a construction contractor.

Commercial solicitations generally use FAR 52.212-1 and any addendum for offer instructions, with FAR 52.212-2 or other stated evaluation criteria for award. The SF 1449 is commonly used, but a combined synopsis/solicitation may provide the solicitation in the notice itself. Read the actual notice and attachments rather than waiting for a particular form.

Whatever the headings, find the instructions and the evaluation criteria and treat them as your L and M.

How do you read Section M before deciding to bid

Start with Section M to understand the award method and whether your company can compete under it. Check the following:

  • The basis for award. In a tradeoff, the agency can pay more for a proposal whose benefits merit the extra cost. Lowest price technically acceptable (LPTA) goes to the lowest evaluated price among acceptable proposals, with no tradeoffs (FAR 15.101).

  • The relative importance of price. Unless an exception applies, FAR 15.304 requires the solicitation to say whether the combined non-price factors are significantly more important than, approximately equal to or significantly less important than price. Assess whether your likely price and documented strengths are competitive under that approach.

  • Each factor and subfactor. Agencies evaluate proposals under the stated criteria, including matters reasonably encompassed by those criteria. Connect your evidence to the relevant factor. Do not expect a general strength or an unrelated capability to earn credit.

  • Past performance and experience. Read Sections L and M together for the number of references, recency period and relevance criteria. A lack of relevant past performance cannot, by itself, receive an unfavorable rating under FAR Part 15. A separate experience requirement may still be disqualifying. GAO's AnderCorp decision illustrates that distinction. See how to win federal contracts without past performance.

  • Pass/fail requirements. Identify every minimum and the evidence needed to meet it. Under 13 CFR 125.5, SBA referral is required when a small business is excluded based on a noncomparative responsibility-type factor, such as company experience or past performance. This does not mean every technical rejection requires referral. A Certificate of Competency addresses responsibility and does not cure unrelated proposal defects.

What should you pull out of Section L

Use Section L to identify the submission requirements:

  • Due date, time and time zone. Submit early and retain proof of receipt. The electronic late-proposal exception in FAR 15.208 requires, among other conditions, receipt at the initial point of entry to the government's infrastructure by 5:00 p.m. one working day before the due date. It is not a substitute for timely delivery to the designated office.

  • Submission method, file formats, size limits and any portal you must register in.

  • Volumes, page limits, fonts, margins and file names.

  • Required forms and signatures, and an acknowledgment of every amendment by the date and time it sets. See how to acknowledge a solicitation amendment.

  • Whether the agency intends to hold discussions with offerors, called negotiations in the overhaul text. The basic FAR 52.215-1 provision states an intent to award without discussions; Alternate I states an intent to hold them. Submit your best proposal initially. The agency may limit the competitive range to the most highly rated proposals and may narrow it further for an efficient competition.

  • Past performance references or questionnaires, key personnel resumes and letters of commitment.

  • The pricing template and how it maps to Section B.

  • The question deadline, site visit or pre-proposal conference, and any oral presentation.

  • Access to controlled attachments. Request access through the authorized SAM.gov account role and follow the agency's instructions. Some defense notices also require JCP certification for export-controlled technical data. Start that process early; a public notice does not guarantee immediate access to every attachment.

Compare each requirement with your calendar and available staff. Do not plan around the agency waiving an omission or allowing you to fix it later.

How do you build a compliance matrix

A compliance matrix maps solicitation instructions, evaluation factors and required proposal responses to their location in your submission. It helps your team check completeness. The FAR does not impose a universal requirement to submit one, but an individual solicitation may require it.

Organize your proposal in Section L's required order, then identify where it addresses each Section M factor. The sample below shows how to record both in one matrix.

Ref Requirement Scored under Where we answer Owner, status
L.4.2 Technical volume, 25-page limit M.2 Technical Vol. I Ops lead, drafting
L.4.5 Three references, similar scope M.3 Past performance Vol. II, 1.0 Owner, 2 of 3
M.2.1 Transition plan M.2.1 Vol. I, 3.0 Project manager, not started
C.5.3 Explain how monthly status reporting will be managed, if a proposal response is required M.2 Technical, if the stated criteria cover it Vol. I, 4.2 Project manager, drafting
J-3 Pricing template, all line items M.4 Price Vol. III Owner, not started

To keep it useful:

  • Use a row for each distinct instruction, evaluation factor and requirement that needs a proposal response. Track performance obligations separately when they do not require proposal content.

  • Check Sections C and H and the J attachments; instructions don't always stay in L.

  • Use the solicitation's own words in your headings so evaluators can find each answer.

  • Update the matrix after every amendment.

If your team can resolve a proposal gap before the required date, record a Hold and assign the action in GoNoGo. Otherwise, record a No-Go. ContractIQ, our sister consultancy, offers solicitation analysis and compliance review separately from the GoNoGo subscription.

Common questions

What if Section L and Section M don't match?

Ask the contracting officer a specific written question before the question deadline and request an amendment if the instructions need to change. If a material, apparent conflict remains, get advice promptly on whether a pre-award protest is warranted. Under 4 CFR 21.2(a)(1), a GAO protest of an apparent solicitation defect generally must be filed before the applicable closing time. A question to the agency does not extend that deadline.

Where do I find Sections L and M on SAM?

In the solicitation documents attached to the notice. They may sit inside the main request for proposals (RFP) file or come as separate attachments, and an amendment can replace either one. Download every attachment and check the latest amendment before you build the matrix.

Did the FAR overhaul change Sections L and M?

The overhaul model text keeps the same basic roles for Sections L and M and moves the format to 15.109. It recommends the format rather than requiring it in the same terms as the codified FAR. It also expressly describes selection of the highest technically rated offer with a fair and reasonable price at 15.103-3. Which procedures apply depends on the solicitation and the agency's effective deviation.

FAR references: During the Revolutionary FAR Overhaul, check the solicitation and the agency's effective deviations to identify the applicable text. The FAR overhaul deviation guide links to the model text and agency actions. Ask the contracting officer to clarify any conflict before the applicable deadline.

Sources

Next guide · 8 min readHow to Win Federal Contracts Without Past Performance