Go/No-Go Decision for Federal Contracts: Scoring Sheet

By GoNoGo editorial teamLast checked October 13, 20268 min read34 primary sources

Short answer

A go/no-go decision helps you decide whether a federal opportunity is worth your team's time. Make that call before you commit people to a proposal. First, confirm that you can compete and perform the work. Then decide whether the opportunity makes business sense compared with the others in your pipeline.

Key facts

What total means Go?
12 to 16: Go.
When is Hold the right call?
Use Hold when a specific issue can still be resolved in time.
Scored 0 on scope fit?
A 0 on scope fit is a No-Go at any total.
Can a high score outweigh eligibility?
No. A failed eligibility requirement still overrides the score.

Add the eight scores for a total out of 16

Score each criterion 0 for no, 1 for partly or 2 for yes.

  • 12 to 16Go.
  • 8 to 11Hold if a specific action before the deadline could improve the score enough to justify bidding. Otherwise, No-Go.
  • Below 8No-Go.
  • Scope fit 0A 0 on scope fit is a No-Go at any total.

These cutoffs are examples for internal planning.

A bid/no-bid decision is the same review under a different name. Record the decision, the reason for it and who approved it, even when the proposal deadline is close.

When should you run a go/no-go review?

  • When you first find the notice in a SAM.gov search, check the eligibility and performance requirements below.
  • Full review, once you have the complete solicitation: read the instructions and evaluation criteria, then complete the scoring sheet. In a request for proposals (RFP) using the uniform contract format, those are Sections L and M.
  • Recheck after each material amendment or answer to a question. Run a final review before submission to confirm that the scope, pricing and eligibility assumptions still hold.

Include the person who would manage the work and the person responsible for the proposal. Assign one person to approve and record the decision.

What go/no-go criteria should you check before scoring?

Check whether you can meet each mandatory requirement by the date it applies. If you cannot, the decision is No-Go. If you need more information and can realistically obtain it in time, choose Hold and set a date to resolve the issue.

  • Eligibility. Confirm the set-aside, required certification and size standard for the NAICS industry code assigned to the solicitation. Size is generally measured when you submit your initial offer with price, but unpriced multiple-award contracts and recertifications have separate rules. Use the rules that apply to this acquisition.
  • Registration. Most prime contractors need an active SAM.gov registration when submitting an offer or quote and again at award. FAR 52.204-13 requires it during performance and through final payment. Check the applicable solicitation provision and any exception under FAR 4.1102.
  • Required qualifications. Check licenses, facility or personnel clearances, key personnel and place of performance. Confirm when each requirement applies. Some are due with the proposal; others apply at award or when performance begins.
  • Bonds. As of October 2026, federal construction contracts over $150,000 generally require performance and payment bonds, with limited exceptions. For contracts over $35,000 and up to $150,000, FAR 28.102-1 generally requires payment protection. The contracting officer selects at least two acceptable options; provide one before a notice to proceed or starting work. If a bid guarantee is required, follow the solicitation. FAR 28.101-2 calls for at least 20% of the bid price, capped at $3 million. A surety's capacity letter does not replace that guarantee. Confirm capacity early and arrange the guarantee for submission.
  • Limitations on subcontracting. Check how much you can pay firms that are not similarly situated. A similarly situated subcontractor must share the status required for the award and be small under the NAICS code assigned to its subcontract. The usual caps are 50% for services, 85% for general construction and 75% for specialty trade construction, with materials excluded for construction. The rules generally apply above $350,000 to ordinary small business set-asides and at any value to the covered socioeconomic programs. Check the contract clause and 13 CFR 125.6 for the calculation and applicable exclusions.
  • Contract type. A cost-reimbursement contract requires an accounting system adequate to determine the costs that apply to the contract (FAR 16.301-3). Confirm that your system and staff can support the required billing and reporting.
  • Deadline. Plan to submit a day early and confirm receipt through the required channel. FAR 15.208 has narrow exceptions for late proposals. Sending an email before the deadline does not, by itself, prove timely receipt.
  • Document access. Request controlled attachments on SAM.gov as soon as you identify the opportunity. Some defense notices also require Joint Certification Program (JCP) certification for access to export-controlled technical data. Follow the Defense Logistics Agency application instructions, including DD Form 2345, and the access instructions in the notice.

How do you score a bid/no-bid decision?

After the mandatory checks, score each criterion 0 for no, 1 for partly or 2 for yes. Base each score on evidence your team can explain.

Criterion Score 2 if...
Scope fit You already do this exact work, at this size
Relevant experience You can show recent, similar jobs, federal or commercial
Customer knowledge You know the agency, the office or the problem beyond the notice
Competitive position You can explain a credible advantage based on the requirement and available evidence
Price You can be competitive and still keep a margin you accept
Proposal capacity Named people have the hours to write a compliant proposal on time
Delivery capacity You can staff, equip and finance the work if you win
Strategic value It opens a new agency or line of work, or protects a current one

Add the eight scores for a total out of 16:

  • 12 to 16: Go.
  • 8 to 11: Hold if a specific action before the deadline could improve the score enough to justify bidding. Otherwise, No-Go.
  • Below 8: No-Go.
  • A 0 on scope fit is a No-Go at any total.

These cutoffs are examples for internal planning. They are not an industry standard or an estimate of your probability of winning. Adjust them as you compare past decisions with actual results.

Free template: download the go/no-go decision template (Excel). It has the eligibility checks, this scoring sheet with the example cutoffs, a weighted bid/no-bid matrix and a decision log, with the formulas already set.

For a weighted bid/no-bid matrix, double the scores on the criteria that matter most. Use 75% or more of the revised maximum for Go, 50% to less than 75% for Hold, and less than 50% for No-Go. A failed eligibility requirement still overrides the score.

For competitive position, research the incumbent and prior awards. Signed-in public users can search contract award data on SAM.gov.

Read the experience and past performance criteria closely. Under FAR 15.305, an offeror with no relevant past performance record cannot be rated favorably or unfavorably on that factor. That protection does not create a neutral rating for a separate experience factor.

The Government Accountability Office (GAO) upheld an unacceptable experience rating when an offeror submitted none of the required company project examples (AnderCorp, B-419984). Our guide to how to win federal contracts without past performance explains how to assess that gap and when teaming may help.

Record the decision and the reason. In GoNoGo, mark the opportunity Go, Hold or No-Go and add a specific next action, such as "Hold: confirm bonding capacity by day 10."

When should you choose Hold?

Use Hold when a specific issue can still be resolved in time. For example:

  • A sources sought or presolicitation notice fits your business. Decide whether to respond now, and keep the potential contract on Hold while you wait for the solicitation.
  • You are waiting for bonding capacity, a teaming partner's commitment or access to a controlled attachment, and expect to resolve it before the required date.
  • You're waiting on answers to your questions or on an expected amendment.

Every Hold needs an owner, a decision date before the response deadline and a clear consequence if the issue remains unresolved. Review open Holds weekly. Do not let an unresolved requirement become a Go simply because the deadline is near.

Follow the notice on SAM.gov, but check it directly as well. When an amendment posts, rerun the relevant checks, update your proposal and acknowledge the amendment as instructed.

What does a go/no-go decision look like? A worked example

Say you run a 9-person HVAC service company in Boise. A total small business set-aside posts to replace two rooftop units and their controls at a federal building two hours away, with proposals due in 30 days. You're small under its NAICS code and registered in SAM.gov. Rooftop work is your core business, but you have only one closely similar job, for a school district, and no federal work.

Assume the solicitation classifies the job as construction, exceeds $150,000 and requires performance and payment bonds plus a bid guarantee. Your surety has not confirmed capacity. The decision is Hold: confirm capacity and the process for obtaining the bid guarantee by day 10, or No-Go.

The surety confirms both on day 7. You score the full solicitation: scope fit 2, relevant experience 1, customer knowledge 0, competitive position 1, price 2, proposal capacity 1, delivery capacity 2 and strategic value 2. The total is 11, still Hold. If you can commit two qualified people to the proposal for a week, proposal capacity becomes 2 and the total reaches 12. That supports a Go under this example, provided the evidence supports the other scores. Obtain and submit the required bid guarantee with the offer.

Guides in this section

Common questions

Can I change my mind after I submit?

For a negotiated procurement, you can generally withdraw a proposal by written notice before award (FAR 15.208). For sealed bidding, a bid can be withdrawn before bid opening; afterward, withdrawal is restricted and mistake procedures may apply. A bid accepted within its acceptance period can bind you. Failure to provide required contract documents or bonds can expose you to liability under the bid guarantee.

Can a large subcontractor do most of the work?

It depends on the contract. The construction caps can permit a large subcontractor to perform most of the construction work. The prime must still meet the applicable subcontracting limit, and on general construction it must manage, supervise and oversee the project. SBA's ostensible subcontractor rule also addresses primary and vital work and unusual reliance. For a mentor-protégé joint venture, the protégé's separate 40% requirement applies to work performed by the partners, with the regulatory adjustments. It is not automatically 40% of total contract revenue (13 CFR 121.103 and 125.8).

Do service contracts need bonds too?

Usually not. FAR 28.103 limits performance and payment bonds outside construction to specified circumstances, including certain contracts with substantial progress payments. Under FAR 28.101-1, an agency generally requires a bid guarantee only when it also requires performance and payment bonds. Read the solicitation's actual requirements.

FAR references: During the Revolutionary FAR Overhaul, check the solicitation and the agency's effective deviations to identify the applicable text. The FAR overhaul deviation guide links to the model text and agency actions. Ask the contracting officer to clarify any conflict before the applicable deadline.